Quantcast
Viewing all articles
Browse latest Browse all 8820

Physical Move of DAG members

I need to shut down and move an Exchange 2010 SP2 DAG member server to another physical site.  This server is already configured with the proper IP/subnet/etc... of the destination site.  Is it sufficient to simply put the server in maintenance mode, shutdown, move, boot, and end maintenance mode?  The down time is anticipated to be about 5 hours.  There is plenty of bandwidth for log replication between the 2 sites.

The end goal is for site-resilience (1 DAG stretched across two physical sites) with the secondary site being entirely passive.  We will also have a CAS/HUB server at the secondary site which is not currently a member of the CAS Array. 


Viewing all articles
Browse latest Browse all 8820

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>