Hello all,
I want to move all the servers from One old data center to another New data center, so can you pls tell me inwhich order will I shutdown and then Start the servers I have a below setup and here we have a big dependency SAN which cannot be move till 48 hours so i am looking for a plan to move to Start Exchange with in max 5 hours?
DAG1 - Contains Two Mailbox Servers
2 X Mailbox Server (Physical box) Connected to their respective local Storage MD3000
a. MBX01 –Disk1 storage array connected to Mailbox server 1
b. MBX02 –Disk2 storage array connected to Mailbox server 2
2 X Cas Servers (Virtual box) Connected to SAN
2 X Hub Server (Virtual box) Connected to SAN
2 X Edge Server (Virtual box) Connected to SAN
1 File Server (Witness Server)
Here CAS/HUB/Edge cannot be moved as connected to SAN so if someone could tell me the best way to move these servers how and in which order. Thanks